What does Construction All Risks insurance cover?
Construction All Risks insurance covers physical damage to the insured property on site resulting from a sudden and unforeseen event during the construction period. The term 'all risks' means that every risk not expressly excluded in the policy is covered. That is why, when assessing a policy, you should first look at what is excluded rather than what is covered.
In Türkiye, these policies are issued under the General Conditions for Construction Insurance and the insurer's special conditions. The general conditions set a standard framework; the needs specific to your project are met through special conditions and extensions.
How is the sum insured set correctly?
Under the general conditions, the sum insured should reflect the value the construction will reach on completion and should not be lower than the contract price. Items such as materials, labor, transport, customs and taxes are included in this value according to the contract. If the amount is understated, underinsurance arises and the claim is paid in proportion to the ratio of the sum insured to the actual value.
During the project, price increases, additional works or changes in scope can affect the sum insured. These changes must be notified to the insurer in writing within the period set in the general conditions and before any loss occurs.
- Update the contract price and additional works regularly.
- Don't forget to include materials supplied by the principal in the sum insured.
- Declare construction machinery as a separate item at its current market value.
- If work is being carried out on an existing structure, clarify whether that structure will be covered separately.
Which extensions should you consider?
Under the general conditions, some risks can only be covered by an endorsement and within set limits. The contractor agreement, the lender or the principal often require some of these covers. Before the project starts, we recommend placing the insurance clause of the contract side by side with the policy and comparing them.
- Third-party liability
- Construction machinery and equipment
- Site facilities and temporary structures
- Debris removal costs
- Express freight and overtime costs
- Strikes, lockouts, riots and civil commotion
- Terrorism
- Maintenance period cover
Why do deductibles and exclusions matter?
A deductible is the amount deducted from the claim payment for each loss and borne by the insured. For natural catastrophes such as earthquake and flood, the deductible is often set differently and higher than for other risks. When comparing quotes, add not only the premium but also the deductible amount and percentage applied to each risk to your table.
The main exclusions in the general conditions include design and calculation errors, the cost of defective material and workmanship itself, mechanical and electrical breakdown of machinery, wear and corrosion, inventory shortages, and indirect losses such as delay, loss of profit and contractual penalties. Some of these risks can be covered by other policies or covers; you need to determine in advance which ones matter for your project.
When does cover start and when does it end?
Cover begins when the insured property is unloaded at the site and ends on the expiry date stated in the policy. For sections that are completed and handed over or put into use, cover may end earlier. Construction delays are common; an extension request must be submitted before the policy expires.
During the maintenance period between provisional acceptance and final acceptance, damage caused while the contractor is remedying defects is covered only if maintenance period cover has been purchased. Some risks are already excluded during this period under the general conditions; confirm the scope in writing.
Pre-policy checklist
Preparing the items below before you collect quotes for your project lays the groundwork for both accurate pricing and a smooth process when a loss occurs:
With this information, obtaining quotes on the same scope from at least several insurers lets you see differences in coverage and deductibles as well as price. As your broker, we prepare this comparison as a table and separately flag any points that do not align with the insurance clause of your contract.
- Insurance obligations in the contractor agreement
- Current contract price and work schedule
- Ground survey and project details
- List and values of the construction machinery to be used
- Surrounding structures and third-party risks
- Loss payee requirements of the lender
Frequently Asked Questions
Should the principal or the contractor take out the CAR policy?
This depends on the contract between the parties. In practice, under most contracts the contractor takes out the policy and the principal and subcontractors are added as additional insureds. What matters is that the interests of all parties are clearly stated in the policy and that it is consistent with the insurance clause of the contract.
Is earthquake risk automatically included in a CAR policy?
The scope depends on the insurer's special conditions and the policy wording as well as the general conditions. We recommend confirming in writing at the quotation stage whether there is cover for natural catastrophes such as earthquake and flood, along with its limit and deductible.
What happens to the policy if construction is delayed?
The policy is valid only for the stated period. If construction will run longer, the insurer must be notified before the expiry date and an additional premium for the extension must be agreed. Losses occurring after the period ends may not be covered if no extension has been made.
Can erection works be insured under the same policy?
If the project is mainly construction work, erection items can be added to the construction policy. If the focus is on machinery and installation work, an Erection All Risks (EAR) policy may be more suitable. Which policy to choose is decided together based on the breakdown of the work items and the structure of the contract.
Istanbul Insurance expert team · Last updated: November 2026 · Reviewed by our technical team.